Co-generation Plants
TURNKEY SOLUTIONS: CASE STUDY
2.2 MW power plant at BIDCO, Thika, Kenya
We have recently completed a turnkey order for setting up a cogeneration plant for Bidco Oil refineries at Thika, Kenya. This plant will produce 2.2 MW of power from a back pressure turbine from Triveni and 20 ton/hr, 67 bar, 465 Deg C superheat , biomass fired boiler from Thermax. The scope also included setting up a conveying system and a 400 TR steam fired vapour absorption chiller, along with CDM benefits facilitated by consultancy from General Carbon.
As a result, this BIDCO plant is one of the most efficient plants in Africa today.